Ministry of Electricity & Energy

   Middle Egypt Electricity Distribution Company (MEEDCO)

  • Design and implementation of reading and billing system Automation Linking with the financial modules such as:

  • General Ledger.

  • Costing.

  • Budgeting.

  • Account Payable.

  • Account Receivable.

  • Purchasing.

  • Stock Control.

  • Design and implementation of Micro-SCADA System.

  • Design and implementation of Automatic Reader System for consumption and Electric Loses) ARSEL (system that automates the process of collecting the readings of the electrical meters directly from the distribution transformer (20000 Meter + 700 HHU).

  • Design and implementation of Digital Relay Set.

  • Design and implementation of 790 digital relay (DRL) units, and as an example: Company Beni-Suef Sector

  1. El-Mermah Panel

    • Design and implementation of 10 digital relay (DRL) units.

    • Design and implementation of 2 Data collection and control (DCC) units.

    • Design and implementation of 10 Transformer Intelligent Modules (TIM) units.

    • Design and implementation of 2 Data collection and control (DCC) units.

  2. Design and implementation of 10 Transformer Intelligent Modules (TIM) units.

  3. El-Gamaa Panel

    • Design and implementation of 5 digital relay (DRL) units. 2: Al-Polandy Panel

    • Design and implementation of 5 digital relay (DRL) units.

  4. Al-Arabian Panel    

    • Design and implementation of 10 digital relay (DRL) units.      

    • Design and implementation of 2 Data collection and control (DCC) units.

    • Design and implementation of 20 Transformer Intelligent Modules (TIM) units.

  5. Abo-Sultan Panel

    • Design and implementation of 2 digital relay (DRL) units.

    • Design and implementation of 1 Data collection and control (DCC) units.

    • Design and implementation of 2 Transformer Intelligent Modules (TIM) units. 

       